Rashid Field

The Rashid field, made up of three platforms, was discovered in 1973, full production began in 1979.

  •  Discovered 
    1973
  •  Platforms
    3
  •  Subsea pipelines 
    6

 

 

Rashid field production is exported to Fateh for processing. Rashid receives water injection, gas lift and fuel gas from Fateh.

The complex contains numerous production wells and has the ability to perform gas/liquid separation, lift gas compression, sea water injection and oil transfer. This field is connected to other platform facilities by subsea lift gas, water injection, and multiphase pipelines.

We currently operate a total of 6 subsea pipelines across the Rashid field, including multiple transfer pipelines between Rashid and Fateh fields.